Questions
we are often asked.....
|
|
Question....
Is the foam system approved by the Licensing Authorities?
|
Answer....
Yes, the system is approved throughout Europe and both the London
and Dublin Fire Brigades.
|
|
Question....
How long will it take to make safe all my tanks?
|
Answer....
We can inject up to 250 cubic metres per day, which means that we will
be finished in one working day.
|
|
Question....
How much disruption is there to my site during the injection?
|
Answer....
The site can remain open during the injection, provided that
there is room for a small lorry.
|
|
Question....
What will I have to do to prepare our
tanks?
|
Answer....
Nothing! Provided that the tanks are free of product, we can
do all the preparatory works on the day.
|
|
Question....
If I want the tanks removed at a later date, can
I do that?
|
Answer....
Yes. Foam filling makes the tank safe to
handle and is advantageous since RG22 weighs only 22kg per cubic
metre.
|
|
Question....
How does the cost of foam filling compare
to alternative methods?
|
Answer....
Foam filling costs are comparable with
alternative methods, with the benefit of minimal interruption.
|
|
Bear
in mind that there is no need to remove the tank lid, or the suctions
or the vents.... we carry out the foam injection through the existing
fill-pipe.
|